Living Documents

Most software documentation is a snapshot: written once at design time, then slowly drifts out of sync with the code. By the time someone reads it, half of it is wrong. Digital Innovation Agents treats documentation as living documents instead. Artifacts update themselves during and after implementation so they always reflect the actual state.

The pattern

Design -> Review (corrections) -> Implementation (running updates) -> Final Sync
   ^              |                        |                                  |
   |              v                        v                                  v
   |         Artifacts              Artifacts                          Artifacts
   |         adjusted               adjusted                           finalized
   |                                                                        |
   +------ Documentation == Code (always in sync) <------------------------+

The loop runs three times per V-Model cycle:

  1. Design to review. Phase 2 creates Features, Phase 3 creates ADRs. Phase 4 opens with a Critical Review that reconciles them against the real codebase. Discrepancies are written back into the source files before any implementation.
  2. Implementation to running updates. During Phase 4 implementation, whenever a technical decision deviates from an ADR, or a Success Criterion cannot be met as specified, or a new dependency is introduced, the affected artifact is updated immediately.
  3. Completion to final sync. Phase 4 ends with a final synchronization step. All Features get Status: Implemented, all ADRs get Implementation Notes, the backlog is updated, the bug log is cross-referenced with commit SHAs.

What gets written back

ArtifactWhat gets updated
Feature specsStatus, Success Criteria verification, Definition of Done, How-It-Works section, Key Files
ADRsStatus (Accepted (modified) or Deprecated), Implementation Notes, deviations from the original proposal
plan-context.mdTech stack (if changed), integrations, updated performance/security values
arc42Affected sections when architecture shifts
_devprocess/context/10_backlog.mdBL-NNN rows (Planned/Active/Review/Done/Waiting/Deferred), dashboard counts, new findings, status transitions, commit SHAs; binding format in BACKLOG-TEMPLATE.md
_devprocess/context/20_bugs.mdEvery bug found, with FIX-NN ID, causal chain, commit SHA
_devprocess/context/40_metrics.mdCycle time per FEATURE, drift count, hypothesis status, phase transitions, cross-phase trigger counts. Append-additive, written from inside existing phase actions
memory/MEMORY.mdWhen architecture key facts change
CLAUDE.mdWhen new project conventions emerge

Why write back before implementation?

The Critical Review in Phase 4 catches the most expensive category of design mistakes: proposals that do not match reality. ADRs written in Phase 3 are proposals. The architect does not yet know exactly what the codebase looks like. When /coding reads the codebase and finds that ADR-003 contradicts an existing pattern, updating the ADR before implementing is cheaper than writing code to the wrong ADR and fixing both later.

The same applies when a Feature's Success Criterion is found to be impossible under the real constraints. Better to update the Feature now than to ship code that does not match the spec.

Why write back during implementation?

When implementation reveals an unexpected constraint (for example, a library does not support a required feature, or a pattern needs to change to fit the existing code), the running updates capture that decision immediately. Without the running writeback, these decisions live in the developer's head (or the PR description) and vanish when the session ends.

Why the final sync?

At the end of Phase 4, every artifact is verified one last time. This is the moment where the cycle promises "documentation equals code". If a Feature is marked Implemented but three of its Success Criteria were quietly dropped, the final sync catches it and forces an explicit decision: either the criteria are genuinely met, or they are removed from the Feature with a reason.

Integration with Phase 7 Release Closure

Phase 7 does a cross-phase final synchronization covering BA, Features, ADRs, arc42, and plan-context.md. This is the last checkpoint before the CHANGELOG is updated and the release is cut. If the BA's Validation section has measurable numbers that can now be filled in (for example, "reduced retro cycle time by 40%"), Phase 7 updates them too.

The opposite: dead documentation

In many teams, documentation lives in Confluence or a wiki, separate from the code. That is dead documentation. No writeback, no synchronization, no integration with the development cycle. It drifts.

Living documents are in the repo, update with the code, and are enforced by the skills at every phase. Drift is actively prevented.

Rules of thumb

  • If it affects the design, write it back. A deviation during implementation is a signal to update the ADR or Feature.
  • If you cannot update the artifact, push back. When the agent is not sure whether to write back, it asks the user.
  • The final sync is non-negotiable. Phase 4 does not close without it.
  • Backlog is a living document too. Every V-Model cycle updates it, not just manual housekeeping.